Wayleaves for leased line installation

If you rent your premises, or the route to your building crosses someone else's land, the line cannot be installed until the owner agrees. That agreement is a wayleave, and it is one of the most common reasons leased line installations wait.

  • We reply by email
  • Forever Communications, part of Forever Group

In short

A wayleave agreement is written legal permission from a land or property owner for network equipment to be installed, maintained and repaired on their property. Openreach, which builds much of the UK's local access network, says one may be needed when the service is for someone other than the owner, such as a tenant. Covered work waits for the owner's signature.

Want help with BTnet?

We can plan it with you or do it for you. Tell us where you are up to.

Contact us

What a wayleave is

A wayleave is permission from a landowner or property owner for network equipment to be installed on, under or over their land or inside their building, and for it to be maintained and repaired afterwards.

Openreach, which builds and maintains much of the UK's local access network, describes its wayleave agreement as a written legal agreement between Openreach and the land or property owner, giving permission to install, maintain or repair the network equipment on their property. Openreach also says a wayleave is usually an ongoing agreement with no end date, so it continues to cover the equipment even if the land or building changes hands.

For a business, the wayleave matters because it is a dependency you do not control directly: the engineering can be planned, but the work cannot start until the owner has signed. Knowing early whether one is needed is the best protection for your installation date.

This page is about wayleaves for telecoms lines. Electricity wayleaves for power cables and pylons are a separate subject with their own arrangements.

When a leased line needs a wayleave

Openreach says it may need a wayleave to install or repair its equipment on private land, or inside a property, where the equipment provides service to people who are not the legal owner, for example a tenant. For a BTnet line, that commonly means:

  • You rent your office or unit, and the line has to pass through common parts, risers or walls owned by your landlord
  • You are in a multi-let building, such as a business centre or a floor of an office block, managed by an agent
  • Your site is on a business park or industrial estate with private roads or land between the public highway and your building
  • The route crosses a neighbour's land, for example where the nearest duct runs along the side of another property
  • New equipment is needed on private land, such as a new duct, a chamber or a pole

Openreach also says that where a landowner has asked for the service themselves and is working with Openreach on the project, a wayleave may not be needed. If you own your building and the land between it and the road, you may not need one either. The site survey is where the need is confirmed.

If you lease your premises, you do not own the building fabric, the risers or the land around it. Your landlord, or their managing agent, has to agree before anyone runs new cables or fits equipment through parts of the building they control.

This catches many businesses out, because the lease may let you use the space but not authorise new works to the structure or common parts. Openreach says it cannot do work that needs a wayleave until it has the signed document back. So a landlord who takes weeks to reply can hold up an otherwise straightforward installation.

Two other points help when talking to a landlord:

  • It is usually ongoing. Openreach says a wayleave is usually an agreement without an end date, which continues if the property changes hands. Landlords may want to read it carefully, and some take legal advice.
  • Payments depend on who is served. Openreach says owners are only entitled to wayleave payments where its equipment on their property provides service to someone other than them, giving neighbours as an example.

Prefer a hand with this?

We can help you plan it and set it up, alongside your own team.

Contact us

How a wayleave is usually arranged

  1. The survey identifies the need. The survey shows the route crosses land or a building that you do not own.
  2. You provide the owner's details. Landlord, managing agent or landowner contact details, so the request can be sent to the right person.
  3. The application is sent. Openreach says its wayleave application for new equipment on private land includes a route plan, the wayleave agreement and an explanation of why permission is needed.
  4. The owner reviews it. They may ask questions, ask for changes to the route, or take legal advice.
  5. The signed agreement is returned. Work covered by the wayleave can be scheduled once it is signed and back with Openreach's wayleaves team.
  6. The engineering work goes ahead. The access line is built along the agreed route and your installation continues towards its committed date.

Openreach also says it has some legal powers under the Electronic Communications Code to seek consent through the courts, but that it prefers not to use them and explores other options first. For a business that needs a line by a particular date, the practical route is to get the owner on board early.

How long does a wayleave take?

There is no fixed time. A wayleave takes as long as it takes the owner to review, agree and sign it, and that depends on the owner, not on BT or on us. A responsive landlord who has signed similar agreements before can turn one round quickly. A landlord who has to consult lawyers, a board or other tenants may take much longer.

Because related work cannot start until the agreement is signed, wayleave time can add directly to your installation time. BT's help pages say BTnet installation can take up to 70 working days, depending on the survey, and wayleaves are one of the reasons the survey matters. See BTnet lead times for how BT sets your date, and excess construction charges for the other common reason jobs need extra work.

How to stop a wayleave delaying your line

  • Tell your landlord early. As soon as you decide on a leased line, let your landlord or managing agent know that a request may follow.
  • Check your lease. See what it says about alterations, telecoms and access to common parts, and who to ask for consent.
  • Name the right contact. Give the details of the person who can actually sign, not just the building reception.
  • Share the plan. A clear explanation of what is being installed and where helps the owner say yes.
  • Ask about existing routes. If other tenants already have dedicated lines, an existing route may make the request simpler.
  • Chase politely and in writing. Keep a record of when the request was sent and followed up.
  • Moving premises? Ask the landlord about telecoms consent before you sign the lease, and allow for it in your move date.

Our guide to moving office with BTnet and our page for offices and business centres cover the multi-let building questions in more detail.

How Forever Communications helps

Forever Communications is an Authorised Supplier for BT. We cannot sign a wayleave for your landlord, but we can help make the request easier to say yes to: spotting early whether one is likely, explaining what it covers in plain words for your landlord, making sure the right contact details reach the right people, and explaining how it affects your committed date.

Contact us to talk about a BTnet line for rented or multi-let premises.

Why buy BTnet from Forever Communications

Forever Communications is part of Forever Group and an Authorised Supplier for BT. We supply BTnet, BT's dedicated leased line internet service, to businesses, schools, charities and public sector organisations, and we help with each step from first enquiry to go-live.

  • The right BTnet option for you: we help you choose a speed, bearer, router and resilience option that fits how your sites actually work, from BTnet plans to BTnet speeds
  • A clear quote: BTnet is priced per site, so we check availability at your address and set out what is included; see leased line cost
  • Installation managed with you: we explain the survey, any wayleave or construction steps and the installation process, and keep you updated on progress
  • Connected services in one conversation: phones with BT Cloud Voice, Wi-Fi, firewalls and backup lines, so the whole set-up is planned together
  • Help after go-live: we can help with faults, changes and upgrades, with the support arrangements confirmed in your quote

BTnet is a business service. Service levels, lead times and features are BT's and are confirmed at order.

Frequently asked questions

What is a wayleave agreement?

A written legal agreement in which a land or property owner gives permission for network equipment to be installed, maintained and repaired on their property. Openreach says its wayleaves are usually ongoing and continue if the owner changes.

Do I need a wayleave for a leased line?

Often, if you rent your premises or the route crosses land you do not own, such as common parts, a business park road or a neighbour's land. The site survey confirms whether one is needed.

Who signs a wayleave?

The owner of the land or building the equipment is installed on, such as your landlord, the freeholder or a landowner. As a tenant, you help by passing on the owner's or managing agent's contact details and asking them to expect the request.

How long does a wayleave take?

There is no fixed time. It depends on how quickly the owner reviews and signs the agreement. Work covered by the wayleave cannot start until it is signed, so start the conversation early.

Does a landlord get paid for a wayleave?

Openreach says owners are only entitled to wayleave payments where its equipment on their property serves someone other than them, giving neighbours as an example. Ask Openreach about its standard rates.

What if my landlord refuses a wayleave?

Talk to them about their concerns and whether a different route would help. Openreach says it has legal powers under the Electronic Communications Code to seek consent through the courts, but prefers to explore other options first.

Still have a question about BTnet?

Ask us and a member of our team will reply by email.

Contact us

Next step

Want a BTnet leased line quote for your business?

Tell Forever Communications what you need and we will come back to you by email with options and next steps.

  1. 1
    Tell us what you needA few lines is enough: your organisation, users or sites, and timescales.
  2. 2
    We read it and reply by emailWith options and clear next steps.
  3. 3
    You decideChoose the option that suits you and we take it from there.

leased-lines.uk is a website of Forever Communications, part of Forever Group. We supply BTnet leased lines and help with every step.

Send a quick enquiry

We reply by email.

About: BTnet

We only use these details to reply to your enquiry.

Talk to us about BTnet

We reply by email.

We only use these details to reply to your enquiry.
Talk to us aboutBTnet
Contact us